Projects  
   
 
 
   
     
  Gateway Village GID Construction Phasing (High Resolution)  
   
 
 
  2019 Landscape Improvement Project

The Gateway Village General Improvement District has hired a landscape company to renovate and improve various areas within the community, including the renovation of five detention ponds, improvements to street rights-of-way, the subdivision entryway and monument sign, and the median in Gateway Avenue. The renovations and improvements will take place during 2019 and 2020. Improvements include updated and improved landscaping, new irrigation, creation of lawn areas, hardscaping, benches, trees, and dog stations. The goal is to transform the detention ponds into multi use areas and overall beautification of the community.

The project will be completed in two phases.

Phase-1 (2019) - Phase 1 of the renovations includes the 5 detention ponds, drainage channel in Gateway Avenue, and the monument area at North Chambers Road and Gateway Avenue.

     Gateway Village Monument Sign
     Gateway Avenue Drainage Channel
     Maxwell Detention Pond
     Greenwood Detention Pond
     Crystal Way Detention Pond
     Eagle Street Detention Pond
     Enid Way Detention Pond

Phase-2 (anticipated for 2020) - Phase 2 of the renovations includes the street rights-of-way.

 
     
     
  Phase-1 Photographs  
   
  Gateway Village Monument Sign  
 
 
   
     
  2019-04-27  Gateway Village Monument Sign - The photo shown above was taken before improvements.  
     
   
     
   
  Gateway Avenue Drainage Channel  
 
 
   
     
  2019-04-27  Gateway Avenue Drainage Channel - The photo shown above was taken before improvements.  
     
   
     
   
  Maxwell Detention Pond  
     
   
     
  2019-08-13 Maxwell Detention Pond  
     
   
     
  2019-08-13 Maxwell Detention Pond  
     
   
     
  2019-08-13 Maxwell Detention Pond  
     
   
     
  2019-08-13 Maxwell Detention Pond  
     
 
 
   
     
   
     
  2019-07-11 Maxwell Detention Pond - The demolition of the existing landscape along the Gateway drainage channel and Maxwell Pond is nearing completion. There are several stumps and large roots to be removed.  
     
 
 
   
     
  2019-04-27 Maxwell Detention Pond - The photo shown above was taken before improvements.  
     
   
     
   
  Greenwood Detention Pond  
 
 
   
     
  2019-07-23 Greenwood Detention Pond - Nearing 90% Completion.  
         
 
 
     
         
  2019-07-23 Greenwood Detention Pond - Looking North   2019-07-18 Greenwood Detention Pond - Looking North  
         
 
 
     
         
  2019-07-23 Greenwood Detention Pond -  Looking West   2019-07-18 Greenwood Detention Pond - Looking West  
         
 
 
     
     
  2019-07-23 Greenwood Detention Pond - Looking West   2019-07-23 Greenwood Detention Pond - Looking South West
         
 
 
     
         
  2019-07-18 Greenwood Detention Pond - Looking North   2019-07-18 Greenwood Detention Pond - Looking North  
         
 
 
   
     
 

2019-07-10 Greenwood Detention Pond - The majority of the concrete has been poured at the Greenwood Pond next to Greenwood Elementary School.  Installation of the irrigation at the location is ongoing.

 
     
 
 
   
     
  2019-04-27  Greenwood Detention Pond  - The photo shown above was taken before improvements.   [Details]  
     
   
     
   
  Crystal Way Detention Pond  
 
 
   
     
  2019-04-27  Crystal Way Detention Pond - The photo shown above was taken before improvements.  
     
   
     
   
  Eagle Street Detention Pond  
 
 
   
     
  2019-07-10 Eagle Street Detention Pond - The concrete steps have been poured at the Eagle pond.  Installation of the irrigation at this location is ongoing.  
     
   
     
 
 
   
     
  2019-04-27  Eagle Street Detention Pond - The photo shown above was taken before improvements.  
     
   
     
   
  Enid Way Detention Pond  
 
 
   
     
  2019-04-27  Enid Way Detention Pond - The photo shown above was taken before improvements.  
     
   
     
     
                   